Current Position:

The company completed the first oil delivery of Zhuhai Gaolan terminal

Source:
Release date:
Views:297

46-1.jpg

At 12:00 on September 25, 2016, the oil tanker "Guoyang 118" left the wharf area, the first condensate ship of CNOOC deepwater natural gas Zhuhai Gaolan terminal was successfully loaded, and the oil extraction terminal served by Shanye company was increased to the 15th.

Zhuhai Gaolan terminal is the first deep-water natural gas terminal in China. The offshore gas from Liwan 3-1 gas field and surrounding gas fields enters the terminal through submarine pipeline, and then gas-liquid separation, dehydration, drying and fractionation are carried out. The qualified natural gas enters the natural gas pipeline network of Guangdong Province after pressurization and metering, As a by-product of natural gas treatment process, condensate is transported by ship to realize industrialization. Shanye company attaches great importance to the first ship oil lifting of Gaolan terminal. The maritime service department, together with CNOOC Shenzhen Branch, has repeatedly visited the terminal site for investigation and office work, conducted in-depth and detailed research and coordinated to solve various possible problems, deployed experienced elite generals in the operation, and ensured the safe and stable transportation and shipment of condensate after nearly 28 hours of on-site efforts.

46-2.jpg